The normal production chain sends inputs to the factory and finished goods from the factory into warehouse storage, then store routes distribute them. Configure each leg instead of expecting one route to infer the whole chain. [topic-1]

What to do

  • Reserve warehouse storage for both factory inputs and finished goods.
  • Assign the factory route and make sure the correct vehicle and manager can serve it.
  • Set store target quantities only after finished goods are arriving at the warehouse.

Why this answer holds

Factory-to-warehouse discussions repeatedly separate production transfer from normal warehouse-to-store delivery. [steam]

Version 1.0 check

Route direction, vehicle class, and schedule depend on the current logistics UI and building access. Verify each leg after one cycle.